Powercore
2026Tesla's solid-state transformer, inverter, and breaker in one unit for batteries, solar, and data centers.
- If Powercore connects the battery or solar site that serves your grid, less of that power is lost on the way, because one unit replaces a chain of inverters and an oil-filled transformer.
- Each Powercore carries 7.4 megawatts continuously at up to 34.5 kilovolts, and its built-in breaker cuts a fault in 100 microseconds, about 1,000 times faster than a conventional breaker.
- Tesla announced Powercore on November 17, 2026, says it will be made in America, and expects the first units to operate in 2027.
Tesla Powercore is a solid-state transformer: one cabinet that takes the direct current (DC) from a battery or a solar array and delivers alternating current (AC) at grid voltage, with the inverter and the circuit breaker built in. Tesla announced it on November 17, 2026, as the hardware between a Megapack and the power line. It is rated at 7.4 megawatts (MW) of continuous power, Tesla says it will be made in America, and the first units are due to operate in 2027.
Introducing Powercore Solid state medium voltage transformer, inverter and breaker - reliable, safe and secure 7.4 MW/9 MVA continuously at 34.5 kVac w/ grid-forming support for 10MVA of peak power Made in America. Operating 2027
— Tesla Megapack (@Tesla_Megapack) See the post on X
What is Powercore?
Powercore does three jobs that large energy sites usually buy as separate equipment. A transformer changes voltage, an inverter turns a battery's DC into the AC the grid carries, and a breaker cuts the power when a fault hits. Tesla's unit handles AC from 10 to 34.5 kilovolts (kV), the medium-voltage range that utility lines use to collect power from a site, and DC from 800 to 2,000 volts. Its full rating is 9 megavolt-amperes (MVA), a measure of total electrical capacity, with up to 10 MVA available at peak.
Why Powercore Exists
A typical battery or solar project uses low-voltage inverters to make AC, then a large transformer with an iron core in a tank of oil to raise that power to grid voltage. On a Megablock, Tesla's 20 megawatt-hour (MWh) package of four Megapacks, the inverters put out 480 volts AC before a separate transformer steps it up. Tesla says that two-step design loses twice as much energy as Powercore does. Supply is the second reason: Electrek reports that orders for conventional transformers now take years to fill as data centers and renewable projects wait for grid connections. Tesla said in September 2025, when it unveiled Megapack 3, that it would build its own transformers.
Elon Musk shared the launch on X the same morning.
Advanced solid state transformers at scale from Tesla
— Elon Musk (@elonmusk) See the post on X
How it Works
Solid-state means the voltage change happens in power electronics, which are fast semiconductor switches, where a conventional transformer uses copper coils around an iron core. Powercore connects to Megapacks directly on the DC side and puts out medium-voltage AC, so the battery's power is converted once. Tesla lists a peak efficiency of 98.86%.
Software controls those switches, which makes Powercore grid-forming: it can set the voltage and frequency of the grid around it, where older inverters only follow them. The built-in breaker clears a fault in 100 microseconds, which Tesla says is about 1,000 times faster than a conventional breaker. The cabinet holds no flammable oil, runs from -40 to 55 degrees Celsius, and is modular, so a part can be replaced in the field while the rest of the unit stays in place.
The Economics of Powercore
Tesla has not given a price. Its pitch to buyers rests on four things: fewer pieces of equipment to buy and wire, less energy lost in conversion, an availability guarantee of 99.9% or better, and warranties of up to 25 years. Units arrive ready to connect to Megapacks, which cuts the electrical work at the site.
For Tesla, Powercore adds a second product to every storage project, since the company can sell the grid connection along with the batteries. The same unit also works as the central inverter for a solar farm, for today's 1,500-volt arrays and the 2,000-volt systems coming next, so Tesla can sell it to solar sites that have no Tesla battery.
Current Status of Powercore
Powercore is announced and due to ship in 2027. Tesla has named no first customer and no factory yet, and says the unit will be made in the US of US and imported parts. The storage business it joins is at record size: Tesla deployed 13.7 gigawatt-hours (GWh) of storage in the third quarter of 2026, as the Tesla Energy dashboard shows, and Tesla's launch video counts 100 GWh of Megapacks in operation.
What Comes Next
Data centers are the third market Tesla names, after storage and solar. Powercore can turn medium-voltage AC directly into 800-volt DC, the power design Nvidia is promoting for racks of artificial intelligence (AI) servers, and Tesla says it is working with Nvidia on those designs. Tesla also says 10 GWh of Megapacks already run at data centers, and Powercore lets those batteries connect on the DC side.
The Bottom Line
Powercore takes Tesla Energy from selling the battery to selling the battery and its connection to the grid. The price, the first customer, and the factory are the details still to come before the 2027 start.
Timeline
- 2015 April 30: Tesla launches Tesla Energy with the Powerwall home battery and the Powerpack for businesses and utilities.
- 2019 July 29: Tesla announces the Megapack, its factory-built utility-scale battery.
- 2025 September: Tesla unveils Megapack 3 and the four-unit Megablock, and says it will build its own transformers.
- 2026 November 17: Tesla announces Powercore, rated at 7.4 MW (9 MVA) continuously at 34.5 kV, and Elon Musk shares the launch on X.
- 2027: The first Powercore units are due to operate.
Sources (5)
- Tesla Megapack on X: Introducing Powercore (November 17, 2026)
- Elon Musk on X: Advanced solid state transformers at scale from Tesla (November 17, 2026)
- Electrek: Tesla unveils 7.4 MW Powercore solid-state transformer (November 17, 2026)
- Not a Tesla App: Tesla Unveils Powercore (November 17, 2026)
- pv magazine USA: Tesla unveils Megapack 3 and Megablock (September 2025)
Order with my Tesla referral link
New Tesla buyers who order through my link get 3 months of Full Self-Driving (Supervised) on a Model 3, Model Y, or eligible Cybertruck, or $400 off a Tesla solar panel system.
Referral link: if you buy through it, I earn Tesla referral credits.
Go to Tesla.com w/ Ryan's Referral Link →Buyer rewards are for first-time Tesla buyers. Reward excludes the Cybertruck Dual Motor All-Wheel Drive, Model S, and Model X.